Penthouse at shoal point in James bay:
- painted all the ceilings and walls and trim upstairs
- unit was a repaint for sale.
- scaffolding to access vaulted ceilings as well as walls
- work was done in accordance with the strata construction requirements;
- service doors to access the buildings
- the padded elevator
- ensured cleaned up so as to not inconvenience the other residents of the building